Skip to main content

We're Hiring - Join the P1 team   Careers

Circa Resort and Casino

The mighty Circa Resort and Casino, the first ground-up resort built in downtown Las Vegas since 1980, was a challenge for the P1 Las Vegas team. But even during a pandemic, there was no work stoppage throughout the entire 22-month project completion period.

P1 did all the plumbing for the 1.25 million sq. ft. facility, using PEX pipe system in the hotel rooms for a more efficient install. A team of seven P1 Virtual Design and Construction experts coordinated model with the construction teams, and both P1 Lawrence and Vegas fabrication shops provided pipe fabrication for the project.

Services Provided

  • VDC/BIM

  • Plumbing Fabrication

  • Plumbing Construction

Project Details

Location

Las Vegas, NV

Completion

Projected: December, 2020

GC

McCarthy Building Companies

Engineer

FEA

Architect

Steelman

construction services icon
Work with Our Construction and Fabrication Experts

Need a team of professional specialty contractors to help with your next construction project? Get started by finding a P1 Construction location near you.

project portfolio icon
View More Construction Projects

Still not sure if P1 Construction, LLC is the right fit? Feel free to check out more examples of our past work and hear from our statisfied customers.