Skip to main content

We're Hiring - Join the P1 team   Careers

University of Kansas Health System Cambridge Tower

Working on new construction around an active hospital is challenging enough, but the University of Kansas Health System (TUKHS) Cambridge Cancer Treatment Center project adds multiple floors to the mix – levels 8, 9, 10, and 12.

P1 Group had to create a high level of efficiency across capabilities. As usual, the team was ready for the challenge with innovations in fabrication, virtual design, and inventory management that have helped this impressive electrical project run smoothly.

Of note are the custom conduit rack rolling carts P1’s electrical fabrication shop developed to fit in the elevators, which allowed for a smoother conduit rack install on the multiple floors. The shop also fabricated all of the branch conduit racks for the 10th, 9th, and 8th floors of the building.

Quick Facts

  • 42,000 field labor hours
  • 22 miles of branch conduit
  • 74 miles of wiring
  • 2,000 fixtures
  • 20+ additional panels/transformers in electrical rooms
  • VMI (Vendor Management Inventory)

Project Details

Location

Kansas City, KS

Completion

2021

GC

JE Dunn

construction services icon
Work with Our Construction and Fabrication Experts

Need a team of professional specialty contractors to help with your next construction project? Get started by finding a P1 Construction location near you.

project portfolio icon
View More Construction Projects

Still not sure if P1 Construction, LLC is the right fit? Feel free to check out more examples of our past work and hear from our statisfied customers.