P1 Group’s Flexibility Helps Magna Continue Production Through Project
P1 Group’s millwright project at Magna Excelsior Springs involved the demolition of three existing storage and retrieval systems and replacing them with new structures. The towers weighed 9,000 pounds and each one had to be operating before the next system could be removed.
P1 provided flexible labor hours to work with Magna to provide efficient and cost saving concepts.
“It was a pleasure working with a group that knew what to do and how to do it. They are a hard working group that performed above all expectations.” - Timothy Hill, Project Engineer, Integrated Systems Design (ISD)
About the author
P1 Construction is a single-source specialty subcontractor specializing in mechanical, electrical, millwright, and architectural metal construction facility solutions.